Structure:
RCC framed structure designed to seismic resistance using high quality materials.
Environment friendly walls with Solid blocks.
Pre-constructional anti-termite treatment under foundation and along external perimeter of the building.
Flooring:
Vitrified Tile will be laid in living, dining, bed rooms, kitchens & walkways inside apartments.
All common areas will be laid with Vitrified Tiles or any other suitable flooring material.
Good quality rustic tiles shall be laid in the balconies and sit out areas.
Ceramic tiles of good quality will be laid in the toilet floor and wash area.
Good quality Ceramic tile flooring shall be laid inside toilets and utility areas.
Good quality Glazed ceramic tiles shall be fixed in toilet walls up to 7’ 0” height and utility area up to 4 feet height.
Suitable projected skirting matching the floor tile as per design shall be provided in all areas.
Electrical:
ISI branded copper wiring in PVC concealed conduits shall be provided.
Branded modular plate switches shall be provided inside the apartments.
15amps electrical conduits for AC points in Living and Bedrooms.
Painting:
Exterior faces of the building including balconies will be finished with Cement Plaster and Exterior emulsion paint finish.
Interior: Smooth finish with POP putty & good Premium emulsion paint.
Common area will be finished with Cement Plaster, POP putty and good quality Premium emulsion paint.
Common area ceiling will be smooth finished with cement plaster and putty finished with good quality interior emulsion paint.
False ceiling in Lobby areas alone as per architects design.
Doors and Windows:
Main Door: Teakwood frame with 32mm thick Solid Flush Shutter finished with 4mm thick Veneer on both sides.
Interior & Toilet doors: Country wood frames with Skin Molded Flush doors duly treated and finished.
Good quality locks with suitable SS hardware’s shall be provided.
Good quality UPVC Windows or Powder Coated Aluminum windows with glass shall be provided.
Aluminum French doors with suitable glass shall be provided.
Minimum of 5mm clear glass panels for windows shall be provided.
Powder coated MS grills for all windows as per design.
Elevators:
Suitable passenger elevators from companies of high repute shall be provided with sufficient power backup.
Kitchen or Utility:
Kitchen cooking platform will be finished with granite stone fixed on suitable RCC platform
Ceramic tiles will be provided in kitchen for a height of 2 feet only above platform in cooking areas.
Single bowl Stainless Steel sink with drain board in Kitchen shall be provided and provision for sink in utility area shall be provided.
Sufficient 15 Amp & 5 Amp socket provision for chimney, hob & other kitchen appliances.
Utility area shall be finished with glazed ceramic tiles in walls up to minimum of 4’0” height.
Provision of Electrical and Plumbing lines for Washing machine in utility.
Security System:
Secured Door Access
CCTV in external peripheral areas of the building.
Water Supply, Plumbing and Sanitary:
ISI certified concealed CPVC lines for water supply and SWR sewer lines.
Superior quality wall-mounted EWC (European water closet) in all toilets inside apartments.
Superior quality washbasins with half pedestal.
Good quality ISI marked CP fittings in toilets, utility & kitchen.
False ceiling in all toilets.
Hot & Cold-water mixer unit in all toilets only for shower shall be provided.