Welcome to TCP Altura Phase 2, a collection of 335 apartments across 4 Towers of 7 floors each that offer you a lifestyle you aspire with amenities that let you live life to the fullest. Get ready to enjoy the high life at TCP Altura Phase 2.
Welcome to TCP Altura Phase 2, a collection of 335 apartments across 4 Towers of 7 floors each that offer you a lifestyle you aspire with amenities that let you live life to the fullest. Get ready to enjoy the high life at TCP Altura Phase 2.
Address: Model School Road, Sholinganallur, Chennai, Tamil Nadu 600119, India.
RCC framed structure with RC foundations conforming to BIS.
Pre-Constructional anti-termite treatment will be provided under foundations, external perimeter of the building as per BIS of the entire building.
Walls will be constructed using Autoclaved Aerated Concrete Blocks(AAC blocks) from Aerocon or equivalent. Corners of walls will be protected with GI mesh and finished. The height will be maintained at 9’10’’ from structural floor to floor.
Internal walls will be finished with cement and gypsum plaster, painted above wall putty.
The toilet walls will be finished with ceramic tiles upto 7’-0’’ height – patterns and sizes will be as recommended by architects. Trims and profiles will be used to protect the vertical edge of the tiles.
Common areas will be finished with gypsum plaster and cement paint.
Dado of 2’-0’’ above the kitchen platform will be finished with ceramic tiles.
Lofts will be provided in kitchen and one bedroom.
Exterior faces of the building (including the balconies) will be finished with cement plaster and paint as recommended by Architects.
Ceiling areas of living, dining, bedrooms, balconies and kitchen will be finished with Wall putty and paint. Ceiling areas of Toilets and other common areas will be finished with cement paint.
Living, Dining and Bedrooms will be finished with vitrified tiles – pattern and colors as suggested by architects.
Kitchen, Balcony and Toilets will be finished with ceramic tiles.
4’’ high skirting matching the floor tile will be provided wherever required.
Staircase and Lobbies will be finished with green Marble or Natural Stone as recommended by Architects. Staircase walls and corridor will be finished with gypsum plaster, wall putty and paint
Car Parks and Driveways will be finished with Granolithic flooring.
African teak wood frame with 40mm thick shutter, polished finish on both sides with locks. Suitable wooden architrave as recommended by Architect and a threshold will be provided for this frame.
Seasoned wooden frame, 32mm thick shutter finished with enamel paint on both sides with locks will be provided.
Seasoned Wooden frame, 32mm thick shutter, finished with enamel paint on one side and laminate finish on the inner side.
UPVC sliding windows will be provided in all rooms with M.S.Grills
UPVC sliding Type French doors will be provided.
Counter top Platform (dry fixing) will be finished with 18mm thick granite slabs 2’-0’’ wide. Stainless Steel Single Bowl sink with drain board will be provided.
Provision for fixing washing machine will be made.
All Sanitary ware will be of ‘white’ color, CP fittings will be provided as suggested by consultant.
Single lever divertor with overhead shower will be provided in all toilets.
Concealed insulated copper multi-strand wires will be provided with distribution board having MCBs. Required Number of switches and sockets will be provided.
Empty conduits for a TV point will be provided in living room.
One telephone point will be provided in living room.
Borewells will be provided at different locations. Water treatment Plant will be provided as recommended by Consultant.
Underground RCC sump of suitable capacity for borewell/ WTP Treated water/ STP.
Treated water will be provided.
Overhead tanks will be provided as recommended by Consultant.
59 L
29. L
Principal + Interest
Where is Lancor TCP Altura Phase 2 located?
Lancor TCP Altura Phase 2 is located in Sholinganallur, Chennai
What are the unit sizes available in Lancor TCP Altura Phase 2?
Unit sizes of the Lancor TCP Altura Phase 2 ranges from 962 - 1129 Sq.Ft .
Is the Lancor TCP Altura Phase 2 RERA registered?
Yes, Lancor TCP Altura Phase 2 is registered under TNRERA and the registration number is TN/01/Building/163/2019 for D block.
What is the price range of Lancor TCP Altura Phase 2 in Sholinganallur, Chennai?
The price of Lancor TCP Altura Phase 2 ranges between 59.9 L - 71.7 L *.
How many units are available in Lancor TCP Altura Phase 2?
There are about 84 units in this project.
What is the total area of Lancor TCP Altura Phase 2?
Lancor TCP Altura Phase 2 Built across 3.5 Acres of land.