Foundation:
RCC Isolated Footing as per Structural Drawing will be provided.
Basement:
2’ ht from existing ground level.
Super Structure:
The Construction will be framed structured as per structural design and using AAC blocks and Gypsum Plastering for inside ceiling and walls.
Joineries:
Main Door: 1st Quality Teakwood frames with solid door’s and other. 2nd quality Teakwood frames with flush door’s(Skin Door).
Windows: UPVC Sliding Window’s.
Flooring:
2’*2’ Vitrified tiles flooring with 4” skirting. Basic Rate 40/- Sq.ft (KAG or ANUJ).
Kitchen:
Granite Slab Platform over RCC Slab and S.S Prince makesink with normal bowl sink(Stainless Steel) will be provided and (2’0 Height) (Ceramic Glazed tiles above Cooking Counter).
Toilets:
Antiskid Ceramic Flooring . Tiles Height 15”*10” upto 7’ht. (KAG/ ANUJ). Basic Rate 28/- Sqft.
Staircase Flooring:
12”*12” Ceramic step tiles(Antiskid).
Lofts & Cupboards:
Two Bedroom and Kitchen shall be provided with one loft, and kadappa slabs shelfs without shutters.
Electrical:
All Switches are modular switches, (Anchor Rider) 3 phase change over switch.
Hall Cum Dining:
One Bell Point, Six light points, two fan points and five nos five amps plug point T.V & Telephone Point 15 amps plug point.
Bedrooms:
Two Light Points, One fan point, and two 5 amps plug point. One Bedroom Alone shall be provided with 15A, power plug for A/c, T.V & Telephone point.
Kitchen:
Two Light Points, One 15 amps Plug point, one exhaust fan point, one Ro plug point, Two 5 amps Plug point.
Toilets:
Two Light Points and one 15 amps Power plug and one 5 amps Plug points in each toilet.
Balcony:
One Light Point, One 5 Amps Plug Point.
Electrical Main Board:
EB Meter Panel Board.
Sanitary & Plumbing:
White Colour EWC – Parryware
White Colour Washbasin – Parryware
CP Fittings – Aqua
Painting:
The Main Door will be melamine polished other doors will be painted with enamel paint. The Ceiling will be white Tractor Emulsion, Inner walls with Putty and Tractor Emulsion, Outer walls with Asian Apex, grills with Enamel painting.
Borewell:
Bore Well Shall be provided and this borewell will be connected to Over head Tank.
Paving Block shall be provided in all the open space around the flats.
Lift
6 Passenger lift will be provided.