Structure
• RCC framed structure with sub structure isolated/combined footing confirming to BIS requirements
• Anti-termite treatment as per BIS requirements
• All Walls with Solid blocks set in cement mortar
• 8? thick solid blocks for outer wall and 4? thick solid block for all partitions
Wall Finish
• Cement Plaster and Putty finish with Premium Emulsion Paint for all internal Walls
• External wall cement plaster finished with weather shield Max/Ace Exterior Emulsion
• The Toilet will be finished with glazed ceramic tiles up to false ceiling
Floor Finishes
• Living, Dining, Bedroom & Kitchen will be finished with 4’2? vitrified tiles
• Balconies, Toilets will be finished with Non-slippery Ceramic Tiles
• Ground Floor Lobbies will be finished with Granite/Marble
• Staircase will be finished with Vitrified tiles/Granite tiles
• Car park areas will be finished Grano flooring
• External Driveway will be finished with Paver blocks/Internal Driveway Concrete flooring
Ceiling
• All ceiling area will be finished with Cement/Gypsum Plaster with emulsion paint
• Kitchen Provision for Chimney and Aqua Guard will be Provided
Doors & Windows
• Entrance Doors: Teakwood Frame, Veneered Flush Shutter and Polished finish. Godrej or Yale locks will be provided
• Bedroom Doors: Teakwood frame, Laminated Flush shutter and polished finish with Godrej or Yale locks will be provided
• Toilet Doors: Teakwood frame, Laminated Flush door and polished/painted with Godrej or Yale locks will be provided
• Windows: UPVC/Aluminium Sliding/open able window with MS Grill and Bug screen as per design of the Architect
• French Door: UPVC Sliding doors without grills
Lift
• The Building will be served with a 10/13 passenger lift with ARD of Johnson/Schindler/Mitsubishi
Toilets
• White European Water Closet wall mounted, Kholer/Roca will be provided in all toilets
• All toilets will have provision for connecting a geyser
• Health Faucet, diverter with an overhead shower will be provided in all toilets
• All CP fittings will be of laquar/Parryware
• Master Toilet with Glass shower partition
Electrical
• Concealed insulated Copper Multi strand Finolex/Polycab FRLS wires in all apartments
• Each Apartment will be provided with a Distribution Board and MCB’s
• All Switches & Sockets of Legrand/Anchor/Great white
• DG back up will be given for common facility like pump, lift, STP etc.,
• Light and Fan points 2 Bedroom 1000W, 3Bedroom 1300W, 4 Bedroom 1500w
Airconditioner
• VRV/VRF Air conditioners shall be provided in all Bedrooms, Living and Dining
Security
• Common Toilet
• Intercom/Video Door Phone will be given for all apartments to Security
• Provision will be given for CCTV cameras in the stilt lift lobbies, entry and exit gates
• Common Toilet for drivers and domestic help would be provided in the stilt floor
• Compound Wall 5 ft height compound wall on all the sides of the plot
Sump & STP
• Underground sump of adequate capacity will be provided
• Underground STP of required size will be provided
,
Rainwater Harvesting
• Will be provided as per the requirements of CMWSSB norms